
Plangreen were successfully awarded the fit out contract to completely refurbish a house in putney. Working closely with the project manager, shell contractor and interior designer the project included, side return and rear extension, double loft conversion and full refurbishment of the existing victorian building fabric.
Duration – 5 months
Works involved:
- Studwork
- Board and insulation
- Full replumb
- Full rewire
- New heating system ‘unvented cylinder system – A rated boiler, water softener and water piped under floor heating
- New floor coverings
- Bathroom joinery
- Bedroom joinery
- 3x bathroom install
Sustainable and energy saving measures:
- Therma fleece wall, ceiling and floor insulation
- Sustainably sourced timber
- Magply – sustainably manufactured plasterboard
- LED light fittings
- A rated heating system with zonal control
- Earthborne and environmentally friendly paint
Recommended Posts
