PlangreenĀ were asked to refurbish and re-design a bathroom and kitchen with in a top floor flat .

Duration – 2 months

Works involved:

  • Strip out
  • Re-design kitchen and bathroom
  • Re-furbish oak floor
  • Service and repair underfloor heating system
  • Service and repair electric boiler
  • Re-design electrics including lighting and sockets

Sustainable and energy saving measures:

  • Re-claimed brick feature wall
  • Earthborne paints
  • Dimmable LED light fittings
  • Draft excluders
  • Existing timber floor treatment