PlangreenĀ were asked to refurbish and re-design a bathroom and kitchen with in a top floor flat .
Duration – 2 months
Works involved:
-
Strip out
-
Re-design kitchen and bathroom
-
Re-furbish oak floor
-
Service and repair underfloor heating system
-
Service and repair electric boiler
-
Re-design electrics including lighting and sockets
Sustainable and energy saving measures:
-
Re-claimed brick feature wall
-
Earthborne paints
-
Dimmable LED light fittings
-
Draft excluders
-
Existing timber floor treatment